Wind Turbines

Park City Wind, Barnstable's agreement, and residents' rights.

Search this topic
Primary source
Did you know

In July 2024 a Vineyard Wind turbine blade failed off Nantucket and debris washed ashore; federal regulators suspended operations.

Receipt BSEE, Vineyard Wind 1 blade failure updates (July 2024)
From: FF pocket page: Wind Turbines (11-26-24) #5 (primary source requested)Not auto-checked
Primary source
Did you know

Easements over conservation land require an Article 97 two-thirds legislative vote — Dowses Beach, Covell's and Craigville were each affected.

Receipt Massachusetts Constitution, Article 97 (Amendments)
From: FF pocket page: Wind Turbines (11-26-24) #10Link checked 2026-09-29
Primary source
Did you know

Under the Host Community Agreement announced May 19, 2022, Park City Wind's transmission cables come ashore under the Craigville Beach parking lot and run to a new substation on Shootflying Hill Road, in exchange for a $16 million host fee.

The developer also agreed to confine beach and roadway construction to non-summer months.

Primary source
Did you know

A senior NOAA scientist wrote to federal regulators on May 13, 2022 that waters south of Nantucket are the only known winter foraging area for North Atlantic right whales, recommending a buffer of at least 20 km.

Sean Hayes (NOAA Northeast Fisheries Science Center) warned the oceanographic effects on the whales' food supply could not be mitigated over the project's operating life.

Primary source
Did you know

Peer-reviewed research projects about 43 million tonnes of wind-turbine blade waste worldwide by 2050, because thermoset composite blades cannot be melted down and are mostly landfilled.

About 2.2 million tonnes of that is projected in the U.S.

Receipt Liu & Barlow, 'Wind turbine blade waste in 2050,' Waste Management
From: Added researchNot auto-checked
Primary source
Did you know

State data show Vineyard Wind's contracts took effect in April 2026 at $69.50 per megawatt-hour, below recent Southeast Massachusetts winter prices of $127-$180.

The state projects about $1.4 billion in ratepayer savings over 20 years — worth knowing before claiming offshore wind raises electric bills.

Public record
Did you know

The Town negotiated the first Park City Wind HCA in 2022 without community meetings beforehand, and chose not to intervene before the Energy Facilities Siting Board.

Receipt Statement on Town Council Item 2025-047, John Crow (pp. 1-2)
From: FF pocket page: Wind Turbines (11-26-24) #7Not auto-checked
Reported by
Did you know

NOAA's Sean Hayes: disturbance to right-whale foraging "could have population-level effects on an already endangered and stressed species."

Receipt Green Oceans One Pager, citation #19
From: FF pocket page: Wind Turbines (11-26-24) #1Link checked 2026-09-29
Reported by
Did you know

BOEM found the projects would have "no measurable influence on climate change."

Receipt Green Oceans One Pager, citation #3
From: FF pocket page: Wind Turbines (11-26-24) #2Link checked 2026-09-29
Reported by
Did you know

Barnstable signed a host community agreement in which Avangrid pays a $16 million fee related to Park City Wind.

Receipt Boston.com, Nov. 17, 2023
From: FF pocket page: Wind Turbines (11-26-24) Residents' rights #10Link checked 2026-09-29
Reported by
Did you know

Employees listing Avangrid as employer made 217 donations totaling $57,677 to state and local campaigns since 2018, including $16,425 to Gov. Healey and $3,036 to Sen. Cyr.

Every donation is a public record — verify individual contributions at OCPF (ocpf.us).

Receipt Boston Herald analysis, via Wind-Watch, July 30, 2024
From: FF pocket page: Wind Turbines (11-26-24) #8Link checked 2026-09-29
Reported by
Did you know

A Vineyard Wind blade failed on July 13, 2024, scattering debris on Nantucket beaches, and the manufacturer blamed a 'manufacturing deviation' its quality assurance should have caught.

Federal regulators (BSEE) ordered the project to stop producing power; GE Vernova re-inspected all blades from its Gaspe, Canada plant.

Reported by
Did you know

GE Vernova agreed to a $10.5 million settlement with Nantucket on July 11, 2025, and the town refused to include Vineyard Wind as a signatory.

Receipt Boston Globe, Nantucket settlement with GE Vernova
From: Added researchLink checked 2026-09-29
Reported by
Did you know

High-voltage switchgear, including wind-farm switchgear, uses SF6 gas, which has about 23,500 times the warming potential of CO2 and a roughly 3,200-year atmospheric lifetime.

In fairness, SF6 is used across the whole electric grid, not only by wind.

Receipt National Grid, 'What is SF6?'
From: Added researchNot auto-checked
Reported by
Did you know

A Boston Herald analysis found Avangrid employees made 217 donations totaling $57,677 to Massachusetts campaigns since March 2018, including 17 contributions totaling $3,036 to Sen. Julian Cyr since 2021.

Small dollar amounts; the analysis concerns disclosure and influence, not illegality.

Receipt Boston Herald, Avangrid employee donation analysis (July 2024)
From: Added research
Our view
Did you know

The plan: attend Councilor Conversations, carry Pocket Pages, build a communication tree, and vote for councilors who support residents' rights.

Receipt Freedom Focus
From: FF pocket page: Wind Turbines (11-26-24) Plan / Action Steps
Needs a source
Did you know

There is not a facility large enough to properly test the blades, according to an engineer at Green Oceans.

Receipt Green Oceans engineer (verbal)
From: FF pocket page: Wind Turbines (11-26-24) #3
Know the source? Send it to us
Needs a source
Did you know

The Cape's sole-source aquifer may be at risk from cable routing.

Receipt Freedom Focus
From: FF pocket page: Wind Turbines (11-26-24) #4
Know the source? Send it to us